Artikel Ilmiah : H1G010011 a.n. DEWI NURFITRI

Kembali Update Delete

NIMH1G010011
NamamhsDEWI NURFITRI
Judul ArtikelPENGARUH WAKTU KONTAK LIMBAH CAIR INDUSTRI TAHU DENGAN MODIFIKASI CONSTRUCTED WETLAND SISTEM FWS MENGGUNAKAN Pistia Stratiotes DALAM PERBAIKAN KUALITAS AIR
Abstrak (Bhs. Indonesia)Constructed wetland system merupakan sistem pengolahan terencana atau terkontrol yang telah di desain dan dibangun menggunakan proses alami yang melibatkan vegetasi, media dan mikroorganisme untuk mengolah air limbah. Tujuan dari penelitian ini adalah mengetahui kemampuan, waktu kontak terbaik dan pemenuhan standar baku mutu yang dinjurkan menggunakan Floating Aquatic Plant System dengan jenis tanaman Pistia stratiotes dalam menurunkan kandungan BOD, nitrat dan TSS pada limbah cair industri tahu. Penelitian dilakukan dengan metode eksperimental menggunakan Rancangan Acak Lengkap (RAL). Perlakuan terbagi menjadi 5 waktu dan diulang sebanyak 4 kali ulangan. Perlakuan tersebut terdiri atas 1 bak kontrol (tanpa tumbuhan dan media), 4 bak perlakuan berisi media (tanah, pasir, kerikil) dan tumbuhan yang diulang sebanyak 4 kali berdasarkan waktu tinggal yaitu 4, 8, 12, dan 16 hari. Penelitian menunjukkan bahwa BOD dan nitrat dapat diturunkan kandungannya sesuai standar baku mutu, untuk nilai TSS mengalami penurunan akan tetapi masih belum sesuai standar baku mutu. Persentase penurunan nilai BOD, nitrat dan TSS berturut-turut sebesar 97%, 40%, dan 43%. Waktu kontak terbaik dalam penurunan BOD dan nitrat adalah pada 8 hari (H8).


Abtrak (Bhs. Inggris)Constructed wetland system is planned or controlled processing system which has been designed and built using natural processes involving vegetation, medium and micro-organism waste water. The purpose of this study was determine the ability, the best contact time and the fulfillment of quality standards that the recommended use of Floating Aquatic Plant System with the type of plant Pistia stratiotes in decrease the content of BOD, nitrate and TSS in waste water out. The study was conducted with an experimental method using Completely Randomized Design (CRD). The treatment is divided into 5th time and repeated four replications, such as treatment is the treatment of industrial waste water out with 1 bath with out vegetation and the media as well as 4 treatments containing media (soil, sand and gravel) and plants were repeated 4 times based on thed well timeis 4, 8, 12, and16 days. The results showed that the BOD and nitrates can be derived in accordance implies quality standards, to the value of TSS decreased but still does not meet quality standards. Percentage content of BOD, nitrate and TSS, respectively for 97%, 40%, and 43%. Best retention time in the reduction of BOD and nitrate on day 8 (H8).

Kata kunciConstructed wetland, the various retention time, Pistia stratiotes
Pembimbing 1Nuning Vita Hidayati, M.Si
Pembimbing 2Drs.Asrul Sahri Siregar, M.Si
Pembimbing 3
Tahun2014
Jumlah Halaman10
Tgl. Entri2014-11-17 13:24:36.318138
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.