| Judul Artikel | DAMPAK RENOVASI DAN PENGEMBANGAN GEDUNG TERHADAP KONDISI HIDROLOGI HOTEL HORIZON PURWOKERTO |
| Abstrak (Bhs. Indonesia) | Kegiatan penambahan kamar dan gedung di Hotel Horizon Purwokerto tentunya akan mempengaruhi banyaknya kebutuhan air masing masing kamar, mengingat sumber air di hotel ini menggunakan air tanah dari sumur dalam. Dengan kondisi daerah tangkapan air yang semakin kritis, maka kesempatan air hujan masuk ke perut bumi menjadi semakin sedikit. Sementara itu pemakaian air tanah melalui pemompaan semakin hari semakin meningkat. Akibatnya terjadi defisit air tanah, yang mengakibatkan makin dalamnya muka air tanah..Tujuan penelitian ini adalah untuk mengetahui dampak serta solusi terhadap kondisi hidrologi dari kegiatan renovasi dan pengembangan Hotel Horizon Purwokerto serta penurunan muka air tanah yang terjadi di sekitarnya. Diperlukan konservasi air untuk mengatasi genangan yang terus bertambah, salah satunya dengan menggunakan metode sumur resapan. Hasil perhitungan diperoleh curah hujan rancangan kala ulang 5 tahun sebesar 68,66 mm/jam. Desain sumur resapan dengan kedalaman 3 m dan diameter 1 m menghasilkan sumur resapan untuk meresapakan limpasan dari atap bangunan sebanyak 162 buah, sumur resapan untuk meresapkan limpasan dari lahan parkir sebanyak 63 buah, sumur resapan untuk meresapkan setengah kapasitas saluran sebanyak 178 buah, sumur resapan untuk meresapkan seluruh kapasitas saluran sebanyak 356 buah. Kegiatan pemompaan di Hotel Horizon ini mengakibatkan penurunan muka air tanah (drawdown) sebesar 14 cm. Untuk mengembalikan muka air tanah kembali seperti semula dibutuhkan jeda waktu pemompaan selama 2,7 jam. |
| Abtrak (Bhs. Inggris) | Adding rooms and building in Horizon Hotel Purwokerto is indeed influence the need of water supply of each facility since Horizon Hotel uses well or ground water resource in order to fulfill their need. As the surface area to which absorb water is getting less and less, thus the chance to get rainfall absorbed underground is automatically getting smaller each time, too. In the other hand, the water usage using water pump is increasing. Therefore, it happens that ground water crisis is unavoidable which causes the drawdownof water surface underground. This research is aimed to reveal the impact and also the solution of the hydrological condition as the result of building development and renovation of Horizon Hotel Purwokerto. Moreover, it is also aimed to gives solution of the problem of drawdown that happens around Horizon Hotel area. Water conservation is considerably necessary in order to solve the problems. One of the ways is by using an infiltration well. The measurement shows that the rainfall, in 5 years of measurement, has reached 68,66 mm/hour. Therefore, 162 3m-depth infiltration wells, with 1m width, are placed on the roof in order to infiltrate rainfall, and other 63 wells are placed on the parking lot. Moreover, 178 wells are needed to infiltrate half of the water channel capacity, while other 356 wells are necessary to be placed in order to infiltrate the whole water channel capacity. Furthermore, the water pumping activity that is conducted in Horizon Hotel Purwokerto has caused the drawdown for 14 cm. In order to restore the water surface, it will take 2,7 hours before attempting another pumping each time. |
| Kata kunci | Kata Kunci : Sumur Resapan, Drawdown, Residual Drawdown |
| Pembimbing 1 | Dr. Eng. Purwanto Bekti Santoso |
| Pembimbing 2 | Sanidhya Nika Purnomo, ST.,MT. |
| Pembimbing 3 | - |
| Tahun | 2014 |
| Jumlah Halaman | 45 |
| Tgl. Entri | (belum diset) |