Judul ArtikelEVALUASI PERANCANGAN INSTALASI LISTRIK PADA GEDUNG SMK N 1 ADIWERNA KABUPATEN TEGAL
Abstrak (Bhs. Indonesia)Perkembangan dalam sektor pendidikan mengalami peningkatan secara signifikan, peningkatan
tersebut mencangkup pembangunan fasilitas pendidikan dan rehabilitasi bangunan. Dalam konteks
pembangunan infrastruktur gedung pendidikan, sistem instalasi listrik memiliki peran penting untuk
mendukung seluruh aktivitas pendidikan. Kebutuhan instalasi listrik pada gedung harus berdasarkan
dengan Persyaratan Umum Instalasi Listrik (PUIL) 2011 dan SNI.
Metode penelitian ini dilakukan menggunakan software AutoCAD 2025 dan LATS-LOAD serta
menggunakan perhitungan secara manual untuk mendapatkan hasil instalasi listrik yang aman dan nyaman.
Penelitian ini dilakukan dengan empat tahap, yaitu tahap persiapan, tahap pengambilan data, tahap
perancangan dan simulasi, serta tahap akhir.
Hasil yang diperoleh pada penelitian menunjukan bahwa beberapa ruangan memiliki intensitas
pencahayaan di bawah standar SNI dan PUIL 2011, sehingga dilakukan penyeragaman lampu
menggunakan TL 36 W dan downlight 24 W untuk mencapai tingkat pencahayaan 250–300 lux. Pada
sistem pendinginan, kapasitas AC existing sebesar 262.500 BTU/hr belum mencukupi kebutuhan aktual
berdasarkan hasil perhitungan manual dan LATS-LOAD sebesar 430.731–504.041 BTU/hr. Evaluasi juga
menunjukkan bahwa sistem pengaman dan penghantar umumnya telah sesuai dengan PUIL 2011, namun
peningkatan kapasitas AC menyebabkan total daya perancangan naik menjadi 53.076 W dari 38.011 W,
sehingga diperlukan penambahan daya langganan PLN minimal 66 kVA agar sistem tetap aman dan efisien.
Abtrak (Bhs. Inggris)Developments in the education sector have increased significantly, including the construction of
educational facilities and the rehabilitation of buildings. In the context of educational building
infrastructure development, electrical installation systems play an important role in supporting all
educational activities. The electrical installation requirements for buildings must be based on the 2011
General Requirements for Electrical Installations (PUIL) and SNI.
This research method was carried out using AutoCAD 2025 and LATS-LOAD software as well as
manual calculations to obtain safe and comfortable electrical installation results. This research was
carried out in four stages, namely the preparation stage, data collection stage, design and simulation stage,
and final stage.
The results indicate that several rooms have lighting intensities below the SNI and PUIL 2011
standards; therefore, luminaires were standardized using 36 W fluorescent (TL) and 24 W downlights to
achieve an illuminance of 250–300 lux. In the cooling system, the existing AC capacity of 262,500 BTU/hr
is insufficient to meet actual demand based on manual calculations and LATS-LOAD results of 430,731
504,041 BTU/hr. The evaluation also shows that the protection devices and conductors are generally
compliant with PUIL 2011; however, the increased AC capacity raises the total design power to 53,076 W
from 38,011 W, necessitating a minimum PLN subscription upgrade to 66 kVA to maintain system safety
and efficiency.
Kata kunciPUIL, AutoCAD, LATS-LOAD, SNI, Arus Pendek, Instalasi Listrik.
Pembimbing 1Ir. Hari Prasetijo, S.T., M.T.
Pembimbing 2Arief Wisnu Wardhana, B.Eng (Hons)., M.Eng
Pembimbing 3-
Tahun2025
Jumlah Halaman28