Artikel Ilmiah : H1E018035 a.n. DINDA KARTIKA HERNAYANTI

Kembali Update Delete

NIMH1E018035
NamamhsDINDA KARTIKA HERNAYANTI
Judul ArtikelPENGUKURAN KINERJA SUPPLY CHAIN MANAGEMENT DENGAN MODEL SUPPLY CHAIN OPERATION REFERENCES (SCOR) MENGGUNAKAN METODE DECISION MAKING TRIAL AND EVALUATION LABORATORY (DEMATEL) - ANALYTICAL NETWORK PROCESS (ANP)
Abstrak (Bhs. Indonesia)PT Astra Daihatsu Motor (ADM) Indonesia, sebagai perusahaan manufaktur
otomotif, berupaya untuk terus berinovasi dalam produksi dan pelayanan. PT ADM memiliki beberapa fasilitas produksi (plant) di Indonesia, termasuk Karawang Engine Plant (KEP) yang bertugas memproduksi dan mengirimkan mesin ke fasilitas perakitan. Penilaian kinerja di PT ADM-KEP saat ini berfokus pada kinerja individu foreman, bukan pada proses secara keseluruhan, sehingga evaluasi manajemen rantai pasok belum optimal. Selain itu, PT ADM-KEP belum memiliki batasan yang jelas untuk setiap indikator kinerja. Oleh karena itu, pengukuran kinerja rantai pasok (Supply Chain Management) menjadi penting untuk mengoptimalkan bisnis. Pengukuran ini berfungsi sebagai umpan balik untuk menilai pencapaian perencanaan dan mengidentifikasi area yang memerlukan penyesuaian dalam perencanaan dan pengendalian. Untuk memastikan keselarasan strategi rantai pasok dengan metrik pengukuran, perlu ditentukan variabel yang akan diukur dan dipantau, mencakup seluruh kegiatan rantai pasokan, mulai dari perencanaan, pengadaan, produksi, pemenuhan permintaan pelanggan, hingga pengembalian. Pengukuran kinerja ini menggunakan metode Supply Chain Operation References (SCOR) dan Decision Making Trial And Evaluation Laboratory - Analytical Network Process (DEMATEL-ANP). Dengan menggunakan metode SCOR, didapatkan 26 KPI dari 29 KPI yang ditentukan untuk digunakan dalam proses selanjutnya menggunakan metode DEMATEL – ANP. Untuk metode DEMATEL – ANP didapatkan 8 rekomendasi perbaikan agar kinerja rantai pasok pada PT. ADM meningkat.
Abtrak (Bhs. Inggris)PT Astra Daihatsu Motor (ADM) Indonesia, as an automotive manufacturing
company, strives to continuously innovate in production and service. PT ADM has
several production facilities (plants) in Indonesia, including Karawang Engine Plant (KEP) which is in charge of producing and delivering engines to assembly facilities. The current performance appraisal at PT ADM-KEP focuses on the performance of individual foreman, rather than the process as a whole, resulting in suboptimal supply chain management evaluation. In addition, PT ADM-KEP does not have clear boundaries for each performance indicator. Therefore, supply chain
performance measurement (Supply Chain Management) is important to optimise
the business. These measurements serve as feedback to assess planning
achievements and identify areas that require adjustments in planning and control.
To ensure the alignment of supply chain strategy with measurement metrics, it is
necessary to determine the variables to be measured and monitored, covering all
supply chain activities, from planning, procurement, production, fulfilment of
customer demand, to returns. This performance measurement uses the Supply
Chain Operation References (SCOR) method and the Decision Making Trial And
Evaluation Laboratory - Analytical Network Process (DEMATEL-ANP). By using
the SCOR method, 26 KPIs out of 29 KPIs were determined to be used in the next
process using the DEMATEL-ANP method. For the DEMATEL - ANP method, 8
improvement recommendations were obtained so that the supply chain performance at PT. ADM increased
Kata kunciPengukuran kinerja, SCOR, DEMATEL - ANP
Pembimbing 1Ir. Amanda Sofiana, S.T.,M.T.
Pembimbing 2Ir. Rani Aulia Imran, S.T.,M.T.
Pembimbing 3
Tahun2025
Jumlah Halaman10
Tgl. Entri2025-02-07 11:48:09.265459
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.