| NIM | A1C019048 |
| Namamhs | FUAD FAISAL FADHOLI |
| Judul Artikel | PROYEKSI KEBUTUHAN ENERGI LISTRIK KABUPATEN BANYUMAS DAN PENYEDIAAN ENERGI LISTRIK PADA PLTA KETENGER MENGGUNAKAN SOFTWARE LEAP |
| Abstrak (Bhs. Indonesia) | Kabupaten Banyumas merupakan kabupaten yang berada di Provinsi Jawa Tengah, PLTA yang berada di Kabupaten Banyumas yaitu PLTA Ketenger. PLTA ini terletak di Desa Ketenger, Baturraden, Banyumas, Jawa Tengah. PLTA Ketenger mampu menghasilkan daya listrik sebesar 8,5 MegaWatt (MW). Daya listrik yang dihasilkan mampu menambah pasokan kebutuhan beban puncak daya listrik untuk Pembangkit Jawa Bali (PJB). Dampak pertumbuhan penduduk yang terus meningkat dan perekonomian yang terus berkembang mengakibatkan meningkatnya konsumsi energi listrik dari berbagai sektor. Perlu dilakukan perencanaan energi listrik guna mengantisipasi krisis energi listrik di masa depan. Perhitungan perencanaan energi listrik ini dilakukan berdasarkan pola pertumbuhan penggunaan energi listrik yang sama dengan tahun dasar serta memperhitungkan faktor pelanggan, pertumbuhan ekonomi, serta elastisitas energi di Kabupaten Banyumas. Perencanaan energi listrik ini dilakukan dengan melakukan simulasi pada software LEAP (Low Emission Analysis Platform) menggunakan skenario BAU (Business as Usual) serta perhitungan manual menggunakan skenario DKL (Daftar Kebutuhan Listrik) 3.2. Hasil penelitian ini menunjukkan pada tahun 2032 permintaan energi dengan metode DKL 3.2 dibutuhkan 2.055.300.522 dan permintaan energi dengan metode BAU dibutuhkan 1.752.317.090 kWh dari total yang tersedia adalah 130.760.653 kWh artinya dalam kurun waktu 10 tahun Kabupaten Banyumas mengalami kenaikan permintaan energi listrik sebesar 92% untuk metode DKL 3.2, dan 66,5% untuk metode BAU dan produksi PLTA Ketenger juga mengalami kenaikan sebesar 141%. Dari hasil tersebut PLTA Ketenger hanya bisa mencukupi energi listrik sebesar 7,46% untuk skenario BAU dan 6,36% untuk skenario DKL 3.2. |
| Abtrak (Bhs. Inggris) | Banyumas Regency is a regency in Central Java Province, the hydropower plant located in Banyumas Regency is Ketenger Hydropower Plant. This hydropower plant is located in Ketenger Village, Baturraden, Banyumas, Central Java. Ketenger Hydropower Plant is capable of producing 8.5 MegaWatt (MW) of electrical power. The power generated is able to increase the supply of peak load power needs for the Java Bali Power Plant (PJB). The impact of increasing population growth and a growing economy has resulted in increased electrical energy consumption from various sectors. It is necessary to do electrical energy planning in order to anticipate the electrical energy crisis in the future. The calculation of electrical energy planning is based on the same growth pattern of electrical energy use as the base year and takes into account customer factors, economic growth, and energy elasticity in Banyumas Regency. This electrical energy planning is carried out by simulating the LEAP (Low Emission Analysis Platform) software using the BAU (Business as Usual) scenario and manual calculations using the DKL (List of Electricity Needs) 3.2 scenario. The results of this study show that in 2032 energy demand using DKL 3.2 method required 2,055,300,522 and energy demand using BAU method required 1,752,317,090 kWh from the total available is 130,760,653 kWh, meaning that within 10 years Banyumas Regency experienced an increase in demand for electrical energy of 92% for DKL 3.2 method, and 66.5% for BAU method and Ketenger Hydro Power Plant production also increased by 141%. From these results, the Ketenger hydropower plant can only provide 7.46% of electricity for the BAU scenario and 6.36% for the DKL 3.2 scenario. |
| Kata kunci | Kabupaten Banyumas, Perencanaan Energi, LEAP, PLTA Ketenger. |
| Pembimbing 1 | Ropiudin, S.TP., M.Si. |
| Pembimbing 2 | Priswanto, S.T., M.Eng. |
| Pembimbing 3 | |
| Tahun | 2023 |
| Jumlah Halaman | 14 |
| Tgl. Entri | 2023-11-21 21:41:27.278408 |
|---|