| NIM | A1C019067 |
| Namamhs | DIMAS ARIFIN |
| Judul Artikel | ANALISIS PERANCANGAN PLTS (PEMBANGKIT LISTRIK TENAGA SURYA) UNTUK IRIGASI DI DESA KALIURIP, KECAMATAN PURWOJATI, KABUPATEN BANYUMAS MENGGUNAKAN PERANGKAT LUNAK HOMER (HYBRID OPTIMIZATION MODEL FOR ELECTRIC RENEWABLE ENERGY) |
| Abstrak (Bhs. Indonesia) | Kebutuhan energi dunia yang meningkat pesat akibat pertumbuhan penduduk, pertumbuhan ekonomi dan peningkatan konsumsi energi, mengakibatkan manusia untuk mencari sumber energi alternatif. Sebagaian besar atau sekitar 80% kebutuhan energi dunia tersebut dipasok dari bahan bakar fosil. Oleh karena itu, banyak negara maju yang kini berlomba-lomba mencari terobosan baru dalam pengembangan pembaharuan teknologi yang mengubah minyak pada energi alternatif. Salah satu sumber energi alternatif yaitu surya dapat memancarkan sumber energi ke permukaan pada bumi. Bumi dapat menyerap 1000 W/m³ energi surya, 30% dari energi yang diserap lalu diarahkan ke angkasa, sebesar 47% diubah ke panas, dan sebesar 23% diperuntukkan sebagai kerja siklus pada permukaan. Potensi energi surya memiliki jangka waktu yang panjang untuk memenuhi kebutuhan energi dunia saat ini karena surya dapat digunakan sebagai sumber energi bagi pembangkit listrik. Instalasi PLTS salah satunya di Desa Kaliurip, Kecamatan Purwojati, Banyumas. PLTS di lokasi ini memiliki kapasitas sebesar 44,64 kWp, terdiri atas 144 panel surya dengan kapasitas 1 buah panel surya sebesar 310 Wp. PLTS ini digunakan sebagai penggerak pompa air untuk mengairi lahan pertanian di desa tersebut. Perhitungan analisis terhadap ketersediaan listrik di pembangkit listrik tenaga surya desa Kaliurip dilakukan menggunakan perangkat lunak HOMER. Perangkat lunak HOMER dapat menentukan perangkat paling baik untuk menghitung pada biaya yang terlibat seperti anggaran operasi, anggaran awal, anggaran perubahan unsur-unsur, anggaran bahan bakar, dan anggaran lainnya.Analisis menggunakan perangkat lunak HOMER mendapatkan hasil yaitu PLTS Desa Kaliurip memiliki potensi energi surya yang sangat melimpah untuk menghasilkan enerrgi listrik, instalasi PLTS di lokasi ini sangat tepat karena di wilayah Desa Kaliurip memiliki rata-rata penyinaran matahari sebesar 4,660 kWh/m2/hari. Total NPC pada proyek PLTS di lapangan bernilai Rp.1.052.034.000,00 dengan operating cost sebesar Rp.29.787.620,00.dan nilai levelized COE senilai Rp. 1.980,00 sedangkan total NPC pada proyek PLTS menggunakan perhitungan adalah Rp. 964.150.500,00 dengan Operating Cost sebesar Rp. 27.232.800,00 dan nilai levelized COE senilai Rp. 1.890,00. Simulasi sistem PLTS menggunakan Homer di lapangan dapat menghasilkan listrik 57.266 kWh/tahun nilai excess electricity sebesar 18.208 dan unmet electric load bernilai 5.245 yang artinya beban tidak terpenuhi oleh sistem mencapai 12,5%. Pada simulasi sistem PLTS menggunakan Homer melalui perhitungan dapat menghasilkan energi listrik sebesar 46.808 kWh/tahun dengan nilai excess electricity sebesar 8.770 dan unmet electric load bernilai 6.683 kWh/tahun yang artinya beban tidak terpenuhi oleh sistem mencapai 16,5%. |
| Abtrak (Bhs. Inggris) | World energy needs are increasing rapidly due to population growth, economic growth and increased energy consumption, causing people to seek alternative energy sources. Most or about 80% of the world's energy needs are supplied from fossil fuels. Therefore, many developed countries are now competing to find new breakthroughs in the development of technological innovations that convert oil into alternative energy. One alternative energy source, namely the sun, can radiate energy sources to the surface of the earth. Earth can absorb 1000 W/m³ of solar energy, 30% of the absorbed energy is then directed into space, 47% is converted to heat, and 23% is designated as cycle work on the surface. The potential for solar energy has a long period of time to meet today's world energy needs because the sun can be used as an energy source for electricity generation. One of the Solar Power Plant installations is in Kaliurip Village, Purwojati District, Banyumas. The Solar Power Plant at this location has a capacity of 44.64 kWp, consisting of 144 solar panels with a capacity of 1 solar panel of 310 Wp. This Solar Power Plant is used as a driving force for water pumps to irrigate agricultural land in the village. Calculation analysis of the availability of electricity in the Kaliurip village solar power plant is carried out using the HOMER software. The HOMER software can determine the best tool for calculating the costs involved such as operating budgets, start-up budgets, component change budgets, fuel budgets, and other budgets. Analysis using the HOMER software yields the result the Solar Power Plant Kaliurip Village has very abundant potential for solar energy to produce electricity, the Solar Power Plant installation at this location is very appropriate because in the Kaliurip Village area it has an average solar irradiance of 4.660 kWh/m2/day. The total NPC in the Solar Power Plant project in the field is Rp. 1,052,034,000.00 with an operating cost of Rp. 29,787,620.00 and a levelized COE value of Rp. 1.980.00 while the total NPC in the PLTS project using the calculation is Rp. 964,150,500.00 with an Operating Cost of Rp. 27,232,800.00 and a levelized COE value of Rp. 1.892.00. Simulation of the Solar Power Plant system using HOMER in the field can produce 57,266 kWh/yr of electricity with an excess electricity value of 18,208 and an unmet electric load of 5,245, which means that the load is not met by the system reaching 12.5%. In the simulation of the Solar Power Plant system using HOMER through calculations it can produce electrical energy of 46,808 kWh/yr with an excess electricity value of 8,770 and an unmet electric load of 6,683 kWh/yr, which means that the load is not met by the system reaching 16.5%. |
| Kata kunci | Energi, panel surya, perangkat lunak, Homer, instalasi |
| Pembimbing 1 | Ropiudin, S.TP., M.Si. |
| Pembimbing 2 | Priswanto, S.T., M.Eng. |
| Pembimbing 3 | |
| Tahun | 2023 |
| Jumlah Halaman | 15 |
| Tgl. Entri | 2023-08-24 12:18:20.898883 |
|---|