Artikel Ilmiah : H1C018040 a.n. M. FATURRACHMAN JULIANSYAH

Kembali Update Delete

NIMH1C018040
NamamhsM. FATURRACHMAN JULIANSYAH
Judul ArtikelGEOLOGI DAN ESTIMASI SUMBERDAYA BATUBARA PADA SEAM A, B, DAN C DENGAN
METODE CIRCULAR USGS, PIT PT. X, KAB. X, PROVINSI KALIMANTAN TIMUR
Abstrak (Bhs. Indonesia)Estimasi sumberdaya batubara berperan penting dalam penaksiran nilai sumberdaya bahan
galian tersebut, sehingga pemilihan metode estimasi harus sesuai dengan karakteristik geologi
keterdapatannya, karena dapat menentukan tingkat keyakinan geologi endapan bahan galian
tersebut. Lokasi penelitian berada di daerah X, Kab. X. Tujuan dari penelitian ini adalah untuk
mengetahui tonase batubara berdasarkan tingkat kepercayaan geologi ke dalam kategori
Tereka, Tertunjuk dan Terukur menggunakan metode Circular USGS. Penelitian ini juga
dilakukan melalui pemetaan geologi terhadap batubara dan batuan lain, kemudian dilakukan
korelasi antar singkapan batubara guna mengetahui karakteristik batuan dan pembuatan peta
geologi serta pengolahan data hasil pemboran berjumlah 112 titik bor. Data yang diperoleh dari
penelitian ini yaitu data pemboran yang tersebar di daerah penelitian, data singkapan batuan di
daerah penelitian, data geologi regional daerah penelitian dan data koordinat lokasi penelitian.
Data hasil pengolahan data pemboran yang telah dianalisis kemudian diperoleh nilai tonase
batubara yang dilakukan di daerah penelitian yakni batubara seam A, B, dan C. Estimasi
sumberdaya tereka dengan radius 1500 m pada seam A diperoleh Tonase sebesar 12.054.206
ton, seam B diperoleh tonase sebesar 3.348.331 ton, seam C diperoleh tonase sebesar
8.771.069 ton, sumberdaya tertunjuk dengan radius 1000 m pada seam A diperoleh Tonase
sebesar 12.479.417 ton, seamB diperoleh tonase sebesar 3.766.112 ton, seam C diperoleh
tonase sebesar 11.531.382 ton. Sedangkan sumberdaya terukur dengan radius 500 m pada
seam A diperoleh Tonase sebesar 47.708.052 ton, seam B diperoleh tonase sebesar
12.334.313 ton, seam C diperoleh tonase sebesar 48.589.824 ton
Abtrak (Bhs. Inggris)Estimation of coal resources is important in assessing the value of this material Resources, so
that the valuation method must be in accordance with the geological characteristics of its
availability, because it can determine the level of geological confidence in the material deposits.
The research location was in theX region, X Regency, East Kalimantan Province. The purpose
of this study was to find out the coal tonnage based on the geological confidence levelin the
category of Affected, Indicated and Measured using the USGS Circular method. This research
was also carried out through geological mapping of coal and rock, then carried out between coal
outcrops to understand coal and geological map making, and then analysis the data in this
research are obtained from mining as much as 112 mining points. After doing these things,
calculation of inferred, indicated and measured Resources can be done. The data obtained from
this study are mining points data in the st udy area, outcrop coal data found in the study area,
the geological data of the study area and the coordinates of the study location. Data obtained
from mining points.The estimated inferred resource with a radius of 1500 m on seam A obtained
a tonnage of12,054,206 tons, seam B obtained a tonnage of 3,348,331 tons, seam C obtained a
tonnage of 8,771,069 tons, an indicated resource with a radius of 1000 m on seam A obtained a
tonnage of 12,479,417 tons, seam B obtained tonnage of 3,766.112 tons, seam C obtained
tonnage of 11,531,382 tons. While the measured resources with a radius of 500 m on seam A
obtained a tonnage of 47,708.052 tons, seam B obtained a tonnage of 12,334,313 tons, seam C
obtained a tonnage of 48,589,824 tons
Kata kunciEstimasi, Sumberdaya, Batubara, Metode Circular USGS
Pembimbing 1Dr. Rachmad Setijadi, S.Si., M.Si.
Pembimbing 2Dr. Ir. Asmoro Widagdo, S.T., M.T.,IPP
Pembimbing 3
Tahun2023
Jumlah Halaman10
Tgl. Entri2023-01-18 08:23:28.232932
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.