| Judul Artikel | STUDI ANALISIS KOORDINASI PROTEKSI PADA SISTEM KELISTRIKAN PABRIK ASAM FOSFAT I PT. PETROKIMIA GRESIK |
| Abstrak (Bhs. Indonesia) | Sistem kelistrikan yang baik dilengkapi dengan sistem proteksi untuk mengamankan komponen dari gangguan, salah satunya hubung singkat. Peralatan proteksi pada Pabrik Asam Fosfat I (PA I) sudah tua dan perlu dilakukan pergantian peralatan, maka diperlukan setting ulang koordinasi proteksinya. Pada penelitian ini dilakukan pemodelan sistem kelistrikan Pabrik PA I dan analisis koordinasi proteksi Over Current Relay (OCR) dan Ground Fault Relay (GFR) dengan standar IEC 60255. Metode penelitian dengan mengumpulkan data yang dibutuhkan, melakukan perhtiungan matematis arus hubung singkat dan setting OCR dan GFR, selanjutnya dilakukan simulasi menggunakan ETAP. Persentase kesalahan perhitungan dan simulai arus hubung singkat maksimum sebesar 2,9 persen dan arus hubung singkat minimum sebesar 0,3 persen. Setting ¬GFR menyesuaikan nilai NGR yang terpasang yaitu sebesar 12 A. Hasil plot kurva TCC sudah sesuai karena tidak ada kurva yang saling berhimpitan. Hasil simulasi menunjukan relay bekerja sesuai urutan kerjanya. |
| Abtrak (Bhs. Inggris) | A good electrical system is completed with a protection system to protect components from disturbances, one of which is a short circuit. The protection equipment at the Phosphoric Acid Plant I (PA I) is old and needs to be replaced, so it is necessary to reset the protection coordination. In this research, the modeling of the PA I Plant electrical system, Over Current Relay (OCR) protection coordination analysis and Ground Fault Relay (GFR) with IEC standard 60255. The research method by collecting the required data, perform mathematical calculations of short-circuit currents and setting OCR and GFR, then a simulation is carried out using ETAP. The percentage of error calculation and simulation of the maximum short circuit current is 2.9 percent and the minimum short circuit current is 0.3 percent. The GFR setting adjusts the installed NGR value of 12 A. The results of the TCC curve plot are appropriate because there are no overlapping curves. The simulation results show that the relay works in the order in which it works. |
| Kata kunci | koordinasi proteksi, rele overcurrent, rele groundfault |
| Pembimbing 1 | Priswanto, S.T., M.Eng. |
| Pembimbing 2 | Hari Prasetijo, S.T., M.T |
| Pembimbing 3 | |
| Tahun | 2022 |
| Jumlah Halaman | 13 |
| Tgl. Entri | 2022-08-12 07:18:17.419785 |
|---|