| Judul Artikel | MENGURANGI LOSS PRODUCTION OPPORTUNITY AKIBAT POWER OUTAGE DENGAN MODIFIKASI LOGIKA PADA MODUL EASYGEN DI FIELD SANGASANGA |
| Abstrak (Bhs. Indonesia) | Field Sangasanga merupakan lapangan produksi minyak dan gas bumi yang berlokasi di Kabupaten Kutai Kartanegara, Kalimantan Timur. Produksi minyak Field Sangasanga saat ini adalah sebesar 4984 BOPD (data Juli 2021). Artificial lift pada sumur-sumur produksi di Field Sangasanga menggunakan listrik sebagai penggeraknya. terganggunya sistem kelistrikan dapat menyebabkan artificial lift sumur-sumur produksi menjadi terhenti akibat dari kejadian power outage sehingga akan terjadi loss production opportunity (LPO). Faktor penyebab LPO yang terjadi dapat diidentifikasi dengan metode analisis faktor penyebab menggunakan diagram tulang ikan serta dilakukan pengembangan penilaian risiko dengan menggunakan metode FMEA (Failure mode and Effects Analisis) dari hasil analisa tersebut ditemukan jenis masalah dominan yang dihadapi yaitu trip akibat main failure (PLN) yang menyebabkan loss production opportunity di Field Sangasanga. Pada sistem pembangkit listrik yang menggunakan PLN sebagai pemasok listrik utama terdapat modul easygen yang mengendalikan kinerja pasokan listrik PLN, mulai dari sinkronisasi, proteksi gangguan listrik, dan manajemen beban. Modul easygen dapat mendeteksi segala jenis gangguan listrik baik itu short ataupun long duration Variation. Hal ini berbeda dengan tipe-tipe relay proteksi lainnya yang hanya dapat mendeteksi gangguan jenis long duration Variation. Berdasarkan hal tersebut, dilakukan modifikasi logika pada modul easygen untuk memisahkan jenis gangguan short dan long duration Variation. Hasil perbaikan yang dilakukan mampu mengurangi potensi kerugian yang diakibatkan LPO mencapai 69,67% per bulan atau sebesar Rp45.388.155,55.
|
| Abtrak (Bhs. Inggris) | The Sangasanga Field is an oil and gas production field located in Kutai Kartanegara Regency, East Kalimantan. The current Sangasanga Field oil production is 4984 BOPD (July 2021 data). Artificial lift in production wells in the Sangasanga Field use electricity as the driving force. So that if the electrical system is disturbed, it can cause the artificial lift of production wells to be stopped due to a power outage so that there will be a loss of production opportunity (LPO). The causes of LPO that occur can be identified by the causal factor analysis method using fishbone diagrams and the development of risk factors using the FMEA (Failure Mode and Effects Analysis) method. The results of the analysis found the dominant type of production opportunities in the Sangasanga Field. In a power generation system that uses PLN as the main supplier, there is an easygen module that controls the performance of PLN’s electricity supply, starting from synchronization, protection from electrical disturbances, and load management. The easygen module can detect all types of electrical disturbances, be it short or long duration variations. This is different from other types of protection relays which can only detect long duration Variation disturbances. Based on this. Modifying the PLC logic on the easygen module to separate the types of short and long duration variations. The results of the improvements made were able to reduce the potential loss caused by LPO reaching 69,67% per month or Rp45.388.155,55.
|
| Kata kunci | loss production opportunity, short duration variation, easygen, logika, trip, power outage |
| Pembimbing 1 | Hesti Susilawati, S.T., M.T. |
| Pembimbing 2 | Ari Fadli, S.T., M. Eng. |
| Pembimbing 3 | |
| Tahun | 2022 |
| Jumlah Halaman | 15 |
| Tgl. Entri | 2022-08-05 14:52:48.123201 |
|---|