| NIM | H1A018044 |
| Namamhs | NOVIA SALSABILA SAFITRI |
| Judul Artikel | PERENCANAAN INSTALASI LISTRIK PADA GEDUNG INSTALASI RAWAT JALAN RUMAH SAKIT ISLAM PURWOKERTO |
| Abstrak (Bhs. Indonesia) | Gedung Instalasi Rawat Jalan merupakan salah satu gedung yang akan direnovasi total oleh Rumah Sakit Islam Purwokerto. Pasokan daya listrik pada gedung ini harus selalu tersedia dan dapat mensuplai semua peralatan listrik pada rumah sakit supaya dapat tercipta kualitas pelayanan rumah sakit yang baik dan nyaman. Penelitian ini bertujuan untuk menganalisis kebutuhan listrik seperti kebutuhan lampu, perhitungan kabel penghantar, menentukan jenis proteksi peralatan listrik, proteksi petir, kapasitas generator set dan transformator yang akan digunakan. Analisis perhitungan dilakukan menggunakan software Microsoft Excel 2016 kemudian hasilnya disesuaikan dengan Standar PUIL 2011. Perancangan instalasi listrik menggunakan software Autocad 2015. Hasil akhir menunjukkan bahwa gedung ini membutuhkan suplai daya sebesar 112,216 kVA dengan penghantar utama yaitu NYFGbY 4x70mm2 dan kabel grounding BCC 1x35mm2. Suplai listrik gedung ini menggunakan tranformator 150 kVA dan genset 150 kVA sebagai suplai daya cadangan. Proteksi petir yang digunakan yaitu penangkal petir elektrostatis dengan radius proteksi 125 meter dan tinggi pemasangan 3,25 meter. |
| Abtrak (Bhs. Inggris) | The Outpatient Care Building is one of the buildings that will be completely renovated by the Rumah Sakit Islam Purwokerto. The supply of electrical power in this building must always be available and be able to supply all electrical equipment in the hospital in order to create a good and comfortable hospital service quality. This study aims to analyze electricity needs such as the need for lighting, calculation of conductor cables, determine the type of protection of electrical equipment, lightning protection, generator set and transformer capacity. The calculation analysis was carried out using Microsoft Excel 2016 software and the results were adjusted to the 2011 PUIL Standard. Electrical installation design using Autocad 2015 software. The final result shows that this building requires a power supply of 112,216 kVA with the main conductor being NYFGbY 4x70mm and BCC grounding cable 1x35mm. The building's electricity supply uses a 150 kVA transformer and a 150 kVA generator as a backup power supply. The lightning protection used is an electrostatic lightning rod with a protection radius of 125 meters and an installation height of 3.25 meters. |
| Kata kunci | AutoCAD 2015, Instalasi Listrik, Peralatan Listrik, Proteksi |
| Pembimbing 1 | Daru Tri Nugroho, S.T., M.T. |
| Pembimbing 2 | Ari Fadli, S.T., M.Eng. |
| Pembimbing 3 | |
| Tahun | 2022 |
| Jumlah Halaman | 14 |
| Tgl. Entri | 2022-07-14 16:02:13.178897 |
|---|