Judul ArtikelPENERAPAN PROJECT MANAGEMENT PADA PROJECT PROOF
OF CONCEPT (POC) SMART METER PLN
Abstrak (Bhs. Indonesia)Untuk meningkatkan kemudahan dan keakuratan dalam pengukuran listrik,
Smart Meter menjadi solusi oleh PLN dan ITDRI Telkom dalam mengakomodir
kebutuhan tersebut. Dalam penerapannya, tentu dibutuhkan perencanaan dan
pelaksanaan yang matang sehingga hasil yang diberikan sesuai dengan harapan dan
berfungsi sebagaimana mestinya, untuk itu peran project management menjadi
sangat penting untuk memastikan pengembangan proyek Smart Meter memberikan
hasil yang maksimal. Salah satu cara untuk mengendalikan biaya dan waktu proyek
menggunakan metode Earned Value Management (EVM). Dari hasil analisa awal
diketahui nilai Cost Performance Index (CPI) sampai dengan 31 Januari 2022
sebesar 0,84 yaitu tergolong boros namun ketika proyek selesai pada tanggal 31
Maret 2022 nilai CPI menjadi 1,09 yaitu tergolong hemat.Walaupun waktu
penyelesaian proyek mundur PoC smart meter PLN dapat melakukan
penghematan. Penghematan ini dicapai dengan adanya pengalihan SDM ke proyek
Telkom lainnya, anggaran proyek PoC Smart Meter PLN dapat dilakukan
penghematan sebesar 8.62%.
Abtrak (Bhs. Inggris)To increase the ease and accuracy of electricity measurement, Smart Meter
is a solution by PLN and ITDRI Telkom in accommodating these needs. In its
implementation, of course, careful planning and implementation is needed so that
the results provided are in accordance with expectations and function properly, for
that the role of project management is very important to ensure that the
development of the Smart Meter project provides maximum results. One way to
control project costs and time is using the Earned Value Management (EVM)
method. From the results of the initial analysis, it is known that the Cost
Performance Index (CPI) until January 31, 2022 is 0.84, which is classified as
wasteful, but when the project is completed on March 31, 2022, the CPI value
becomes 1.09, which is considered economical. Even though the project completion
time is backwards, PoC Smart Meter PLN can make savings. This savings was
achieved by transferring human resources to other Telkom projects, the PLN Smart
Meter PoC project budget could save 8.62%.
Kata kunciProject Management, Earn Value Management (EVM), Cost Performance Index (CPI)
Pembimbing 1Farida Asriani, S.Si., M.T.
Pembimbing 2Daru Tri Nugroho, S.T., M.T.
Pembimbing 3
Tahun2022
Jumlah Halaman15
Tgl. Entri2022-07-08 11:12:18.269231
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.