Artikel Ilmiah : H1C016045 a.n. SHINTA MAHARANI PUTRI
| NIM | H1C016045 |
|---|---|
| Namamhs | SHINTA MAHARANI PUTRI |
| Judul Artikel | KAJIAN KESTABILAN LERENG TAMBANG BATUBARA BERDASARKAN METODE MORGENSTERN-PRICE DAERAH “SMP” DAN SEKITARNYA, TANJUNG ENIM, SUMATERA SELATAN |
| Abstrak (Bhs. Indonesia) | Lokasi penelitian secara administratif masuk kedalam wilayah PIT Banko Tengah milik PT. Bukit Asam Tbk. (Persero) yang terletak di Kecamatan Tanjung Enim, Kabupaten Muara Enim, Sumatera Selatan. Daerah penelitian merupakan area pertambangan batubara yang merupakan bagian dari Formasi Muara Enim. Metode yang digunakan dalam melakukan kajian kestabilan lereng daerah penelitian terkait mencari nilai faktor keamanan yaitu menggunakan metode morgenstern-price. Penelitian ini bertujuan untuk mengetahui kondisi geologi daerah penelitian dan untuk menghitung nilai Faktor Keamanan (FK) serta melakukan analisis lereng tambang batubara daerah penelitian. Pemodelan lereng tambang dilakukan untuk mengetahui nilai Faktor Keamanan (FK) pada lereng tunggal (single slope) dan lereng keseluruhan (overall slope) menggunakan data parameter geoteknik berupa nilai sifat fisik dan mekanik batuan. Perhitungan kestabilan lereng tunggal dilakukan mulai dari Overburden A hingga Underburden E dengan menggunakan trial and error berdasarkan rasio tinggi dan lebar serta sudut lereng yang berbedabeda disesuaikan dengan ketebalan masing-masing lapisan. Berdasarkan hasil perhitungan didapatkan hasil bahwa setiap single slope dari penampang X12 A-A’ memiliki kondisi FK > 1,25. Pada bagian high wall untuk setiap single slope memiliki kondisi yang aman, yaitu dengan rincian lapisan overburden A1 nilai FK yang dihasilkan 1,292, lapisan seam coal A1 hingga lapisan interburden A1-A2 memiliki nilai FK 7,557, lapisan seam coal A2 memiliki nilai FK 5,465, interburden A2-B1 dan seam coal B1 nilai FK 1,998, lapisan interburden B1-B2 dan seam coal B2 nilai FK sebesar 1,344, interburden B2-C hingga lapisan seam coal C nilai FK 1,308, interburden C-D dan seam coal C nilai FK sebesar 1,521. Terakhir, pada interburden D-E dan seam coal E nilai FK sebesar 1,299. Kemudian pada lereng bagian low wall lapisan penyusunnya yaitu lapisan underburden E yang memiliki nilai FK yang 1,277. |
| Abtrak (Bhs. Inggris) | The research location is administratively included in the PIT Banko Tengah area owned by PT. Bukit Asam Tbk. (Persero) which is located in Tanjung Enim District, Muara Enim Regency, South Sumatra. The research area is a coal mining area which is part of the Muara Enim Formation. The method used in conducting a study of the stability of the slope in the research area related to finding the value of the safety factor is using the Morgenstern-Price method. This study aims to determine the geological conditions of the research area and to calculate the value factor of safety (FS) and to analyze the slopes of the coal mine in the research area. Mining slope modeling is carried out to determine the value factor of safety (FS) on a single slope and overall slope using geotechnical parameter data in the form of physical and mechanical properties of rocks. Calculation of single slope stability is carried out from Overburden A to Underburden E using trial and error based on the ratio of height and width as well as different slope angles adjusted to the thickness of each layer. Based on the calculation results, the results show that each single slope of the X12 A-A 'cross section has a FS condition> 1.25. The high wall for each single slope has a safe condition, namely with the details of the A1 overburden layer the FS value is 1.292, the A1 coal seam layer to the A1-A2 interburden layer has a FS value of 7.557, the A2 seam coal layer has an FS value of 5.465, interburden A2-B1 and seam coal B1 with FS value 1.998, interburden layer B1-B2 and seam coal B2 with FS value of 1.344, interburden B2-C to seam coal C with FS value of 1.308, interburden CD and seam coal C with FS value of 1.521. Finally, for interburden D-E and seam coal E, the FS value is 1.299. Then on the slope of the low wall the constituent layer is the underburden E layer which has a FS value of 1.277 |
| Kata kunci | Kestabilan Lereng, Metode Morgenstern-Price, Faktor Keamanan, Tanjung Enim |
| Pembimbing 1 | Ir. Adi Candra, S.T., M.T. |
| Pembimbing 2 | Ir. Januar Aziz Zaenurrohman, S.T.,M.Eng. |
| Pembimbing 3 | |
| Tahun | 2021 |
| Jumlah Halaman | 20 |
| Tgl. Entri | 2021-04-14 14:07:27.214325 |