Artikel Ilmiah : A1C016047 a.n. ARIF PRASETYO

Kembali Update Delete

NIMA1C016047
NamamhsARIF PRASETYO
Judul ArtikelIDENTIFIKASI PEMBOROSAN DAN REKOMENDASI PERBAIKAN
MENGGUNAKAN VALUE STREAM MAPPING
PADA PRODUKSI KERIPIK TEMPE
(STUDI KASUS: IKM SUKA NICKY)
Abstrak (Bhs. Indonesia)IKM Suka Nicky merupakan salah satu IKM yang bergerak di bidang
pembuatan makanan ringan seperti keripik tempe, jenang buah, abon ikan, dan lain-
lain. Produk unggulan dari IKM Suka Nicky yang sering diproduksi saat ini yaitu
keripik tempe. Di dalam lini produksi keripik tempe masih terdapat permasalahan
yang dikategorikan sebagai waste. Dalam penelitian ini, metode yang digunakan
adalah metode Value Stream Mapping, untuk memudahkan dalam proses identifikasi
waste digunakan metode Process Activity Mapping (PAM). Waste yang telah
diidentifikasi dikelompokkan menurut kategori seven waste, kemudian dirangking
dengan metode Waste Assessment Model (WAM). Hasil akhir dari metode WAM
kemudian dipilih 3 waste tertinggi yaitu waste motion, waste defect, dan waste
inventory. Dari 3 waste tertinggi, kemudian dianalisa akar penyebab waste
menggunakan diagram ishikawa. Berdasarkan akar penyebab waste, kemudian
dirancanglah usulan perbaikan. Perbaikan yang diusulkan adalah perubahan layout
produksi. Setelah diberikan rekomendasi maka dapat digambarkan prediksi Future
State Map.
Abtrak (Bhs. Inggris)IKM Suka Nicky was one of IKM who worked in produced snack as tempe
chips, fruit porridge, fish abon, and others. The superior product of IKM Suka Nicky
who often produced now is tempe chips. In the line of tempe chips production still
have problems are classified as waste. In this research, the method used was Value
Stream Mapping method, to easier for waste identification used Process Activity
Mapping (PAM) method. Waste that have been identified classified according to
seven waste, then ranked used Waste Assessment Model (WAM). The final result of
WAM method then choosed 3 highest waste was motion waste, defect waste, and
inventory waste. From 3 highest waste, then analyzed the root cause waste used
ishikawa diagram. Based on cause root waste, then designed proposal improvement.
The improvement who proposed was changed the production layout. After these
recommendations, so it can be described to Future State Map.
Kata kunciValue Stream Mapping, Process Activity Mapping, Waste Assessment Model, Diagram Ishikawa.
Pembimbing 1Arief Sudarmaji, S.T., M.T., Ph.D
Pembimbing 2Hety Handayani Hidayat, S.TP., M.Si
Pembimbing 3
Tahun2020
Jumlah Halaman16
Tgl. Entri2020-10-05 05:33:00.566244
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.