Artikel Ilmiah : C1B014095 a.n. AKRIMI MATSWAYA
| NIM | C1B014095 |
|---|---|
| Namamhs | AKRIMI MATSWAYA |
| Judul Artikel | ANALISIS PERENCANAAN KAPASITAS PRODUKSI DENGAN METODE ROUGHT CUT CAPACITY PLANNING (RCCP) PADA PEMBUATAN PRODUK KASUR BUSA (Studi pada PT Buana Spring Foam di Purwokerto) |
| Abstrak (Bhs. Indonesia) | Penelitian dilakukan pada PT Buana Spring Foam di Purwokerto, yang memproduksi spring bed dan kasur busa. Pokok masalah dalam penelitian ini adalah menyusun rencana kapasitas produksi kasur busa sehingga mampu memenuhi permintaan konsumen yang beragam sesuai dengan yang dijadwalkan. Perencanaan kapasitas dilakukan dengan metode Rought Cup Capacity Planning (RCCP). Untuk melakukan analisis dengan metode RCCP ada empat langkah yang harus dilakukan. Pertama, melakukan peramalan dengan metode trend, metode pemulusan dengan musiman, metode moving average, dan metode pemulusan. Hasil peramalan menyatakan bahwa data penjualan akan semakin menurun. Kemudian menghitung perencanaan agregat dengan metode tenaga kerja tetap dan metode transportasi atas dasar hasil peramalan. Selanjutnya dilakukan proses disagregasi dengan metode cut & fit untuk mengetahui jumlah produk setiap jenisnya yang akan menghasilkan jadwal induk produksi. Kedua, menentukan waktu proses produksi didapat dari perhitungan lamanya waktu mesin untuk memproduksi suatu produk. Ketiga, menghitung bill of capacity dengan cara mencari standar hours pada setiap jenis produk. Keempat, menghitung kebutuhan sumber daya spesifik dan membuat laporan RCCP. Pada tahap ini metode yang digunakan adalah bill of labour untuk mengasilkan kapasitas terpakai. Sedangkan untuk kapasitas tersedia didapat dari perhitungan rencana produksi. Bedasarkan hasil perhitungan tersebut dibuat load profile yang menunjukan bahwa hasil penelitian terhadap jadwal induk produksi layak digunakan untuk proses produksi kasur busa. Kelayakan ini dihitung berdasarkan kesesuaian antara total kapasitas tersedia 28224 unit dengan kapasitas terpakai 19415 unit. Oleh karena itu kapasitas tersedia dapat memenuhi kapasitas terpakai. |
| Abtrak (Bhs. Inggris) | The study at PT Buana Spring Foam in Purwokerto, and was produc spring beds and bed foams. The problem focus on this study is make a plan for the production for bed foam, untill can full fit of demand consumers was schedule. Capacity plan doing with method rought cup capacity planning (RCCP) method. For analysis with the RCCP method are four step should be doing. First, doing forecast with trend method, smoothing method with seasonality, moving average method, and smoothing method. Forecasting results state that sales data will be down. Then calculate the aggregate planning with the method of permanent labor and transportation methods on the basis of forecasting results. The disaggregation process is then carried out using the cut & fit method to determine the number of products of each type which will produce a master production schedule. Second, determining the production process time is obtained from the calculation of the length of time the machine produces a product. Third, calculate the bill of capacity by finding the standard hours for each type of product. Fourth, calculate specific resource requirements and make an RCCP report. At this stage the method used is a bill of labor to produce used capacity. Whereas the available capacity is obtained from the calculation of the production plan. Based on the results of the calculation, a load profile is made which shows that the results of research on the master production schedule are suitable for the production of foam mattresses. This feasibility is calculated based on the suitability between the total available capacity of 28224 units and the utilization capacity of 19415 units. Therefore the available capacity can meet the capacity used. |
| Kata kunci | Kapasitas Produksi, Jadwal Induk Produksi, Rought Cut Capacity Planning |
| Pembimbing 1 | Drs. Untung Kumorohadi, M.Si |
| Pembimbing 2 | Retno Widuri, SE., M.Si |
| Pembimbing 3 | Dra. Suci Indriati, M.Si |
| Tahun | 2019 |
| Jumlah Halaman | 21 |
| Tgl. Entri | 2019-02-18 11:48:24.265715 |