Artikel Ilmiah : H1C014059 a.n. Pandu Sukma Hibatullah

Kembali Update Delete

NIMH1C014059
NamamhsPandu Sukma Hibatullah
Judul ArtikelANALISIS KOORDINASI PENGAMAN OVER CURRENT RELAY, GROUND FAULT RELAY, DAN RECLOSER TERHADAP GANGGUAN ARUS HUBUNG SINGKAT PADA PENYULANG KALIBAKAL-11 PT.PLN (PERSERO) GARDU INDUK KALIBAKAL PURWOKERTO
Abstrak (Bhs. Indonesia)Pada tahun 2017 penyulang Kalibakal-11 yang berada di gardu induk Kalibakal, Purwokerto telah mengalami trip (pemadaman) lebih dari 3 kali selama tahun 2017. Kondisi tersebut mengindikasikan adanya koordinasi relai yang kurang baik antara PMT outgoing dengan recloser pada penyulang Kalibakal-11. Koordinasi relai merupakan waktu kerja over current relay dan ground fault relay dalam mengatasi gangguan serta selisih waktu kerja over current relay dan ground fault relay antar tiap peralatan proteksi. Untuk mengetahui koordinasi relai yang baik dalam mengatasi gangguan diperlukan perhitungan, yaitu arus nominal trafo, reaktansi sumber, reaktansi trafo, impedansi, dan arus hubung singkat. Pada penelitian ini, diperoleh perhitungan arus hubung singkat dengan nilai terbesar yaitu 10490,272 A dan terkecil yaitu 1127,453. Perhitungan arus hubung singkat yang telah dilakukan selanjutnya akan menjadi dasar dalam menentukan waktu kerja dan selisih waktu kerja (Δt) relai antara PMT outgoing dan recloser. Pada perhitungan awal, Δt relai antara PMT outgoing dengan recloser masih belum sesuai dengan standar PLN yang selama 0,4 detik. Sehingga diperlukan pengaturan ulang pada nilai tms untuk menyesuaikan Δt relai dengan standar PLN. Nilai tms diatur ulang menjadi 0,318 untuk PMT outgoing dan 0,1 untuk recloser. Dengan selisih waktu kerja (Δt) yang telah sesuai dengan standar PLN, relai pada PMT outgoing dan recloser dapat berkoordinasi lebih baik.
Abtrak (Bhs. Inggris)In 2017, Kalibakal-11 feeder in Kalibakal Substation, has experienced trips more than 3 times. This condition indicates a poor relay coordination between outgoing circuit breaker and recloser at Kalibakal-11 feeder. Relay coordination is the working time of over current relay and ground fault relay in overcoming the disturbance as well as the interval time of over current relay and ground fault relay between each protection equipment. To know the coordination of good relays in overcoming the disturbance required calculations, such as nominal current transformer, source reactance, transformer reactance, impedance, and short circuit current. In this study, obtained the calculation of short circuit current with the largest value is 10490,227 A and the smallest is 1127,453 A. The calculation of the short circuit current that has been carried out will then be the basis in determining the working time and the interval time (Δt) of relay between outgoing circuit breaker and recloser. In the initial calculation, Δt relay between outgoing circuit breaker with recloser still not in accordance with PLN standard which for 0,4 second. Therefore it is necessary to reset the tms value to adjust Δt of relay with PLN standard. The tms value is reset to 0,318 for outgoing circuit breaker and 0,1 for recloser. With the interval time (Δt) that has been in accordance with PLN standard, relay on outgoing circuit breaker and recloser will coordinate better.
Kata kunciKoordinasi, over current relay, ground fault relay, gangguan hubung singkat
Pembimbing 1Daru Tri Nugroho, S.T., M.T.
Pembimbing 2Eko Murdyantoro, S.T., M.T.
Pembimbing 3
Tahun2018
Jumlah Halaman8
Tgl. Entri2018-07-26 13:32:34.688282
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.