Artikel Ilmiah : H1C010008 a.n. SAMUEL AUGUST PRATAMA
| NIM | H1C010008 |
|---|---|
| Namamhs | SAMUEL AUGUST PRATAMA |
| Judul Artikel | ANALISIS KOORDINASI PROTEKSI PENYULANG 2 PURBALINGGA TERHADAP ARUS HUBUNG SINGKAT JARINGAN DISTRIBUSI TEGANGAN MENENGAH 20 kV DI PT. PLN (Persero) RAYON PURBALINGGA |
| Abstrak (Bhs. Indonesia) | Hampir semua kebutuhan manusia harus ditunjang dengan ketersediaan listrik, sehingga listrik menjadi kebutuhan primer dan semakin hari kebutuhan listrik semakin meningkat. Penyaluran dan Pendistribusian tenaga listrik juga dipengaruhi oleh gangguan – gangguan yang berada pada system distribusi tenaga listrik. Gangguan pada sistem distribusi ini berpengaruh terhadap penurunan pelayanan. Oleh karena itulah dibutuhkan suatu sistem proteksi listrik yang dapat mengamankan pendistribusian tenaga listrik dari gangguan-gangguan tersebut. Pada system jaringan distribusi 20kV, pengamanan terhadap gangguan terdiri dari PMT incoming, PMT outgoing, recloser, dan fuse cut off. Gangguan yang muncul pada jaringan distribusi 20kV adalah gangguan yang bersifat temporer.Oleh karena itu, recloser yang dimana sebagai alat pengaman utama, dapat menutup kembali secara otomatis ketika gangguan telah dapat diatasi agar kontuinitas penyaluran listrik tetap terjaga. Dalam penelitian ini juga menggunakan software ETAP (Electric Transient and Analysis Program) yang dimana hasil keluaran simulasi perhitungan berdasarkan ETAP akan dibandingkan dengan hasil perhitungan manual berdasarkan data-data yang didapat dilapangan. Hasil penelitian kali ini diperoleh bahwa koordinasi proteksi penyulang PBG-02 perlu pengaturan ulang koordinasi OCR pada PMT Outgoing karena untuk menghindari kemungkinan terjadinya trip bersama dengan recloser 02.58 yang berada dibelakangnya. Nilai setting dan koordinasi relai terpasang harus dihitung secara bertahap, dimulai dari data panjang jaringan, nilai arus gangguan, penghitungan setting dan pengecekan koordinasi relai. |
| Abtrak (Bhs. Inggris) | Almost all human needs should be supported by the availability of electricity, so electricity became the primary needs and increasingly growing electricity needs. Electric power Distribution also is affected by the disorder in the electric power distribution system. This distribution system disorders affect a decrease in service. Therefore it takes an electrical protection system that can secure the distribution of electric power from these disturbances. In Distribusi network 20kV system, safeguards against disruption consists of PMT incoming, PMT outgoing, recloser, fuse and cut off. Disorders that appear in the distribution network 20kV is a disorder that is temporary. Therefore, the recloser where as the primary safety tool, can close again automatically when the distractions have been insurmountable in order for electrical distribution kontuinitas stay awake. In this study also uses software ETAP (Electric Transient and Analysis Program) in which the output of simulation calculation based on ETAP will be compared with the results of manual calculation based on data obtained in field. This time the research results obtained that the coordination of protection penyulang PBG-02 need reset coordination OCR on PMT Outgoing due to avoid the possibility of the trip along with the recloser 02:58 who were behind. The value of the setting and coordination of relay attached must be calculated incrementally, starting with the long data network, the value of the current disruptions, counting the setting and checking of relay coordination. |
| Kata kunci | Proteksi, Gangguan, ETAP |
| Pembimbing 1 | Daru Tri Nugroho,S.T.,M.T |
| Pembimbing 2 | Hari Prasetijo,S.T.,M.T |
| Pembimbing 3 | |
| Tahun | 2017 |
| Jumlah Halaman | 12 |
| Tgl. Entri | 2017-08-09 23:11:08.641213 |