Judul ArtikelMAKALAH SEMINAR HASIL TUGAS AKHIR ANALISIS DISTRIBUSI TEGANGAN LEBIH AKIBAT SAMBARAN PETIR SISTEM PROTEKSI JARINGAN TEGANGAN MENENGAH 20 KV KBL 06 PT. PLN (Persero) AREA PURWOKERTO
Abstrak (Bhs. Indonesia) Dalam penelitian ini akan dilakukan pemodelan sesuai dengan keadaan nyata pada penyulang KBL 06 menggunakan software ATP EMTP pada titik yang sering mengalami gangguan,kemudian dilakukan simulasi pengaruh tegangan lebih akibat sambaran petir dengan memodelkan penyulang KBL 06 menggunakan software ATP EMTP pada 3 titik yang sering mengalami gangguan,sehingga dapat diperhitungkan pengaman arrester yang tepat agar dapat meredam arus gangguan yang diakibatkan oleh surja petir. Gangguan yang terbesar dalam sistem tenaga listrik terjadi di daerah penyaluran distribusi, karena hampir sebagian besar sistem terdiri dari penyaluran. Spesifikasi teknik pada penyulang KBL 06 perlu dikaji sehingga kita dapat menentukan sistem proteksi terhadap gangguan petir pada penyulang KBL 06 secara efektif agar sistem proteksi dan kehandalan pelayanan menjadi lebih baik, dan dapat menyelesaikan permasalahan tersebut secara ekonomis dan efisien. Berdasarkan hasil dari pembahasan dan analisa, Jumlah arrester yang terpasang dijaringan listrik kurang, sehingga menyebabkan proteksi terhadap gangguan surja petir kurang maksimal. Hasil yang diperoleh setelah melakukan analisa dan perhitungan menunjukkan bahwa penyulang KBL 06 membutuhkan penambahan proteksi yaitu penambahan arrester. Disamping itu, jarak pemasangan arrester pada daerah rawan petir semakin pendek akan semakin baik, karena waktu pengamanan terhadap tegangan lebih surja petir akan semakin cepat.


Abtrak (Bhs. Inggris)
The enormous disruption of the power is occurred in the distribution area because almost of this area system consists of distribution process. The specification of the technique in feeder KBL 06 is required to examine thus we can determine effectively the protection system toward electrical disturbance in feeder KBL 06 in order to create the protection system and reliable service better also it is able to solve the problem economically and efficiently. This research is examined by modeling based on the real condition in feeder KBL 06 used ATP EMTP software in the main area in which disruption is mostly occurred, then the simulation of the influence of over voltage caused by surge electric is done by modeling feeder KBL 06 used ATP EMTP software in 3 areas, therefore the protection of arrester can be calculated appropriately to muffle the current disruption caused by surge electric. The magnitude of transient voltage will occur highest if the location is near with surge electric. Before the arrester is well-installed, the transient voltage is occurred highest in the section 3 probe 3 with value around 3.731.100 kV. In the simulation of arrester, MOV which is installed in feeder is able to cut the rising induction of over voltage and neutralize the disruption quickly. Based on the analytical result and the statistical, the distance of arrester installation in feeder KBL 06 toward surge electric which is nearer with the equipment is better since the time of protection through the over voltage of surge electric would be more quickly.

Kata kunciPetir, Penyulang KBL. 02, Arrester, ATP Draw
Pembimbing 1Daru Tri Nugroho., S.T., M.T.
Pembimbing 2Winasis., S.T., M.Eng.
Pembimbing 3
Tahun2016