Judul ArtikelANALISIS ANGKUTAN SEDIMEN LAYANG (SUSPENDED LOAD) PADA BANGUNAN KANTONG LUMPUR (SETTLING BASIN) BENDUNG GERAK SERAYU
Abstrak (Bhs. Indonesia)Bendung Gerak Serayu sebagai bangunan pengatur muka air memiliki beberapa bangunan pelengkap salah satunya adalah bangunan kantong lumpur. Kantong lumpur merupakan salah satu bangunan pelengkap bendung yang berfungsi mengendapkan sedimen layang / suspended load yang melewati pintu intake. Besarnya angkutan sedimen layang dipengaruhi oleh beberapa hal seperti tingginya curah hujan, keberhasilan konservasi lahan dan material saluran irigasi yang dilewati. Pada penelitian ini peneliti mencoba untuk menganalisis tentang angkutan sedimen yang terjadi di kantong lumpur bendung gerak serayu baik itu mengenai jumlah angkutan sedimen ataupun periode penggelontoran untuk menjaga keefektifan kantong lumpur.
Untuk mengetahui dan memperkirakan jumlah angkutan sedimen layang yang terjadi di kantong lumpur pada penelitian ini menggunakan metode Seksi Hidrometri. Untuk mengetahui besarnya angkutan sedimen layang ada beberapa parameter yang harus diketahui seperti kosentrasi, debit air dan gambar teknis bangunan itu sendiri. Dari hasil perhitungan didapatkan nilai kosentrasi yang berbeda antara titik pengamatan sebelum di kantong lumpur dan setelah kantong lumpur. Debit sedimen layang yang diendapakan berdasarkan metode seksi hidrometri sebesar 1518,902 ton/hari dan memeliki nilai efisiensi sebesar 60 %. Dengan volume yang diendapkan sebesar 1146,341 m3/hari dan volume efektif kantong lumpur bendung gerak serayu sebesar 9858,708 m3, maka diperlukan periode penggelontoran sedimen yang mengendap selama 9 hari sekali.
Abtrak (Bhs. Inggris)Serayu Motion Weir as water level control structures have some complementary buildings one of which is settling basin. Settling basin is one of the buildings that serve complementary weir precipitate suspended load passes through the intake door. The magnitude of suspended load transport is influenced by several things such as high rainfall, the success of land conservation and irrigation material that is passed. In this study, researchers tried to analyze about sediment transport that occurs in settling basin Serayu Motion Weir either on the amount of sediment transport or flushing period to maintain the effectiveness of settling basin.
To find and estimate the amount of sediment transport that occurs in settling basin of suspended load in this study using Hydrometric Section. To determine the amount of sediment transport overpass there are several parameters that must be known as concentration, water flow and technical image of the building it self. From the calculation results obtained concentration values are different between the observation point before in the bag after settling basin and silt. Elevated sediment discharge was sedimented by Hydrometric Section method of 1518,902 tonnes / day and own a 60% efficiency rate. With the volume deposited at 1146,341 m 3 / day and the effective volume of settling basin Serayu Motion Weir of 9858,708 m 3, the required period of flushing sediment that settles for 9 days.
Kata kunciBendung Gerak Serayu, Kantong Lumpur, Sedimen Layang
Pembimbing 1Nastain, S.T.,M.T.
Pembimbing 2Arwan Apriyono, S.T,.M.Eng.
Pembimbing 3
Tahun2014
Jumlah Halaman11
Tgl. Entri2014-11-23 19:51:24.746203
Cetak Bukti Unggah
© Universitas Jenderal Soedirman 2026 All rights reserved.